Highways & Floodways

April 16, 2021

How Environmental Regulation Has Helped Produce Better Linear Infrastructure Designs

Written by Mary Powell and David Skuodas from the Mile High Flood District

It’s interesting to observe the similarities between highways and floodways when it comes to infrastructure design. They’re both long and linear, crossing through many topographic features as they convey a flow of cars or water. Over time, the design approach to these long linear infrastructure projects has evolved, and much of the positive change can be credited to environmental regulation. Although science and technology have clearly evolved over time, helping improve designs, regulations have been a major driving force behind more inclusive decision making processes. Decision making processes identify which variables or disciplines will even be considered in determining what a successful project will be.

Let’s look at some examples to illustrate this point.

If you’ve ever visited Colorado, you probably headed into the mountains, which means you probably drove on Interstate 70 (I-70). As you drive west along I-70 from Denver you pass over and through several prominent natural features, such as Loveland Pass, Vail Pass, and Glenwood Canyon.

It’s fascinating to note how the highway designs at these features are a visual representation of the influence of environmental regulations on highway engineering. 

In the case of I-70, the driving regulations were associated with the National Environmental Policy Act (NEPA), which was enacted in 1970. NEPA requires that federal projects be evaluated for environmental impacts and also requires a public input process. The establishment of NEPA meant there would be no more designing of highways without considering other community values, such as the environment.

Pre-NEPA Highway Design

Construction on the Eisenhower Tunnel at Loveland Pass (the highest vehicular tunnel in the world!) began in 1969, so prior to NEPA. Construction on the first tunnel bore was completed in 1973 and the second was completed in 1979.

As you drive through the tunnel and the approaches on either side, it’s quite clear they were designed with one thing in mind – getting cars from point A to point B as quickly as possible. This was the goal of the project, but when other goals aren’t considered something can get lost, opportunities can be missed. In this instance the design looks like someone came up with a magic cross section and profile slope and off they went ramming a template through the existing topography (see image below).

There are major cuts and fills everywhere, with the road slashing across the slope with very little regard to the land, and almost no consideration for anything except getting cars from A to B. The project design team was pretty much comprised of only engineers, and the result is quite visibly pre-NEPA – it paid very little regard to environmental values. Notice on this image how, from above, the road looks like an actual scar on the landscape, clearly working against the terrain instead of with it.

Post-NEPA Highway Design

Drive a bit further west and you arrive at Vail Pass. Vail Pass was designed after NEPA was implemented and the public was greatly involved with the project. Variables beyond just the engineering goals entered the decision making process. Much more thought went into how the road was laid across the land to minimize impacts, and more effort was put into restoring disturbed areas.

To minimize cut and fill slopes, the east and west lanes diverge in places by several hundred feet (see image below), and retaining walls were used.

Notice how close mature trees are to the highway in the photo below. You can’t see it, but the east bound lanes are up on top of that wall on the left.

Viaducts were constructed to span sensitive areas and allow for wildlife movement underneath them, like in the photo below.

Another new design approach on Vail Pass was construction of a recreation trail, which was a new element influenced by public involvement.

The project included multiple goals – not only getting cars from point A to point B, but also recreation and environment goals.

Landscape architects, wildlife biologists, archaeologists (an important site was discovered and excavated prior to construction), and restoration ecologists were part of the multi-discipline design team.

Further Post-NEPA Highway Design

Finally, as we drive further west, we reach Glenwood Canyon, where the highway construction was completed in 1992. What an amazing reach of highway! The 4-lane version of the road still retains a lot of the character of the historic 2-lane road that clung to the canyon walls.

So many trees and shrubs were protected that there is very little scarring visible. You can hardly tell where rock was blasted and removed. Although, one reason for that is a special stain was developed for areas of rock removal. The freshly exposed rocks were stained to match surrounding rock, which speaks to the importance of aesthetics to the project. In many areas the roadway was elevated on piers, meaning there was little or no disturbance to the ground, and many existing trees and shrubs were preserved directly under the new highway.

And again, we have integration of recreational features and extensive consideration of the environment. A multi-discipline team was critical – engineering, landscape architecture, wildlife biology, cultural resources, and restoration ecology. The result was one of the most beautiful stretches of highway in the United States, built in a way that maximized the potential value of the corridor in as many ways as practical, well beyond only moving cars from A to B.

How might the evolution of roadway design be analogous to the evolution of urban stream design?

While we were working on a project along Little Dry Creek at Westminster Station we were thinking back to an upstream project on the same creek from the 1990’s, and how much design had evolved since that time. Which reminded us of what the 1980’s vintage channel was like even farther upstream, and how much THAT differed from the 1990’s project.

Bam! It occurred to us:

A similar evolution of project design for urban streams had occurred over time as with roadways, with the same positive influence from environmental regulations. 

In this case, rather than NEPA, it was Section 404 of the Clean Water Act.

The photos below were taken just one mile apart along Little Dry Creek, illustrating the stark contrast in urban stream design from the 1980’s to today.

The Watershed

The Little Dry Creek watershed is in the inner northwest part of the Denver metro area and includes parts of Arvada, Westminster, and Adams County. It’s a pretty big watershed and as you look at the aerial, you’ll see that it’s very built out and has been for quite some time. This is an older part of the metro area.

Our area of focus is toward the downstream end, between Sheridan and Federal Boulevards. This is a highly urbanized area, and when it originally developed there was no real accommodation for flood control or stormwater management. In most places, development goes right up to the edge of the very narrow drainageway corridor. These upper reaches of the creek are representative of how urban development happened back in the 70’s and 80’s.

Pre-Environmental Mitigation Design

The first parallel we see with I-70 is what goals the older flood control projects focused on. The older projects were all about moving water (rather than cars) from point A to point B. Find the magic cross section and profile slope and plow a template through the topography, with no consideration for how it fits in with the land or environment. The historic pattern of land development left so little room for the creek there really was no other choice for conveying flood water.

These early projects were master planned and designed in the late 1970s to early 1980s, which is early in the Section 404 history. The first 404 permits were issued in 1977, so there were no real requirements or guidelines yet for consideration of the environment, meaning it was acceptable to completely eliminate anything natural about the stream corridor.

As a result, the older designs often lined every surface of the stream with concrete. Why? Because it’s very efficient at moving water. 

If flood conveyance is the only variable being considered, the design in the photo below works quite well.

Post-Environmental Mitigation Design

As time went by, the Army Corps of Engineers and the EPA began to issue guidance on how projects were evaluated under Section 404. In 1990, they started focusing on mitigation, including having upland buffers adjacent to streams and on putting back wetlands that were impacted. But still no focus on stream bed mitigation.

As the Corps pushed engineers to move away from concrete trapezoidal channels, grouted boulder edging was used a lot.

The Corps eventually started asking for no grout, just dry stacked boulders, so the boulders got REALLY big to satisfy the engineers’ desire for a factor of safety. Eventually, the Corps started saying “no” to boulder edging at all, and asked for a more natural material along the water’s edge.

Little by little, the Corps began to require mitigation be incorporated into channel design in order to get a permit. A big example early on was “bio-engineering”. Ok, what did that mean? The District looked into it and did a pilot study on Clear Creek. Initially it was a series of soil riprap weirs with little sprigs of willows stuck into the riprap. The pilot study had mixed success, but suddenly, lots of projects had riprap with willow staking.

For engineers at the time, this was pretty “out there”. Wouldn’t the roots deform the riprap? Would flows just rip everything out? They worried about the design not being locked into place. Roots instead of grout, would that even work?  Riprap assuaged the fear of instability from design engineers, and the willow stakes provided the natural material the Corps was looking for, but problems could still develop.

So many willows would get planted that a monoculture could overgrow the creek bottom and actually increase flood risk (see photo below).

In large open spaces there tended to be enough room to allow for this, but in high risk urban areas with confined stream corridors the increase in flood risk from overgrown vegetation was a problem.

But still, adding willow stakes to riprap was a small step towards making engineers more comfortable with designs that relied less on traditional hardened structural features and more on vegetation for stability.  

Then the Corps started requiring that vertical drops along the creek bottom be limited to one foot or less, to improve passage for aquatic organisms. This lead to a migration away from large sheet pile or concrete drop structures, that historically could be up to 10 feet high like in the photo below…

…towards shorter sloping grouted boulder structures like in the following photo.

Further Post-Environmental Mitigation Design

In 2008, the Corps and EPA issued new mitigation guidance – which totally focused on the functions and values of the aquatic ecosystem and replacing those as closely as possible in channel designs. There was a big push to maintain the length of stream, meaning a project must result in the same linear feet or sinuosity along the stream as before the project. There would be no more straightening and shortening of channels to move the water through quickly from A to B.

As engineers grappled with this new requirement, it resulted in channel alignments with perfect sine waves that had fixed wavelengths and amplitudes, like in the photo below.

This was more natural looking than previous stream designs, but a little too geometrically perfect to truly mimic what would be seen in nature.

The result of all these incremental requests by the Corps was to get engineers to come up with creative solutions, which led to changes in stream channel design practices and floodplain management.

Designs were pushed away from the single focus of moving water from A to B (which forced a fixed single objective solution onto the landscape), toward having multiple project goals and multi-discipline teams. 

More and more nuance was being added, more variables being considered, and more value was being created as a result. Flood conveyance was still being achieved, and additional valuable community objectives were being met along with it.

The Little Dry Creek at Westminster Station project represents the culmination of this channel design evolution – analogous to the Glenwood Canyon section of I-70. It fully incorporates flood and stormwater management, along with environmental and public interests, into the project design. The vegetation isn’t just dressing over structural materials, the vegetation IS the structural material in many places, meaning we have fewer of the costly structural features common in older designs.

An extensive amount of riprap was still used in places on the project, but rather than simply plugging the riprap with willow stakes, a diverse plant palette of grasses, shrubs, and trees were planted to both stabilize the stream channel and create biodiversity.

The design exemplifies working with the inherent character of natural systems, rather than forcing a fixed single objective solution into a setting. While there are definitely fixed points and guidance, the design allows the water and system to behave naturally as much as possible.

It makes sense that, within the context of meeting project specific stormwater management goals:

The end result of letting streams be more natural is a much more robust and productive system.

A system able to put the water to much more productive use supporting a functional aquatic ecosystem, rather than moving it through as quickly as possible.

Conclusions

So what have we learned from all of this?

Regulations keep evolving and influencing project designs. And, generally speaking, the regulatory push has helped produce better outcomes that meet more goals, and engineers have embraced the challenge. It can certainly be argued what the most effective level of regulation should be, but it’s hard to argue with the positive results these example projects have illustrated. At the very least, the regulations have forced more inclusive decision making processes, which has helped produce linear infrastructure that provides multiple benefits to the community and to the environment.

So, circling back to I-70 and the evolution of environmentally sensitive highway design, what future strides will transportation design take? Certainly driverless cars will affect our systems, but what if engineers take it even further? What if cars didn’t even need roads? What if they all flew, like in the movie Back to the Future?

Is there someplace similar stream designs can go? What if we went into the watershed and created enough runoff reduction to create hydrology that actually mimics natural pre-development hydrology? Not just in peak flows, but also in the volume, duration, frequency, and seasonality of flow reaching the stream.

Well in that case there would no longer be a need for stream restoration and flood control projects like Little Dry Creek at Westminster Station.